PulseWire · Construction Season
Construction Season
Every road closure and construction hit across the city — the big ones first, in plain English.
- 114active disruptions
- 10major routes hit
- 0h 51m since last update
The city at a glance
What’s torn up today
Tap a coloured road stretch for closure details.
Showing all 114 closures
Major routes hit
The big ones today
Auto-ranked — the roads that carry the most traffic, hit hardest, for the longest.
121 Street NW
ClosureYellowhead Trail to Bush Pilot Road
through October 31121 St closed from Yellowhead Trail to South of Yellowhead Trail. Eastbound and Westbound thru movements only at the intersection. Detour using 156 St, St Albert Trail, 127 St, 107 St, or 97 St
Yellowhead Trail NW
Delay127 Street NW to St Albert Trail NW
through October 31Total closure of the Yellowhead Tr North Service Rd from West of 129 St to East of 128 St. Local access to 129 St, 128 St, and 126 Av maintained from 127 St.
Terwillegar Drive NW
DelayAnthony Henday Drive NW to Windermere Boulevard SW
through October 31Starts May 8th. Travel Delays on Terwillegar Drive to Anthony Henday Drive due to road construction.
Terwillegar Drive NW
DelayAnthony Henday Drive NW to Windermere Boulevard SW
through October 31Traffic pattern change on Terwillegar Drive SW Southbound north of Windermere Blvd. Through traffic reduced to a single lane. Dedicated single right and left turn lanes. Expect Major delays.
Yellowhead Trail NW
DelaySt Albert Trail NW to 97 Street NW
through December 31, 2027Yellowhead Tr, 97 St – St Albert Tr will be reduced to 2 lanes each way in phases to accommodate the YHT Tr freeway conversion project.
Whitemud Drive NW
Increased Travel Time53 Avenue NW to 122 Street NW
through October 30Whitemud Drive reduced to 2 travel lanes per direction from 53 Ave to 122 St. Speed reduced full time. Expect travel delays.
108 Street
ClosureJasper Avenue to 102 Avenue
through October 23108 Street is closed from alley north of Jasper Avenue to 102 Avenue for EPCOR Distribution utility installation. Pedestrian traffic maintained along 108 Street.
106 Street NW
ClosureJasper Avenue NW to 102 Avenue NW
through October 31106 St from the alley north of Jasper Av to 102 Av, is closed. The east sidewalk will also be closed; use the west sidewalk.
105 Street NW
Closureat 102 Avenue NW
through December 31Starting July 15, the intersection of 105 St and 102 Ave will be closed to traffic. Pedestrian access will generally be maintained on at least one side of each street.
102 Avenue NW
ClosureWellington Crescent to 132 Street NW
through March 15, 2027102 Av will be closed from Wellington Cres / 130 St to west of 132 St for replacement of the Wellington Bridge. The closure includes the sidewalks on both sides of the bridge and the trail underneath. Access to/from 130 St at 102 Ave and the 132 St /102 Ave intersection will also be closed as part of the work.
Road closures · street by street
What’s hit — and how
Yellowhead Trail NW
Increased Travel Time127 Street NW to 124 Street
through December 31Yellowhead Trail and 127 St will be reduced to two lanes in all four directions with all left turn movements banned.
112 Avenue NW
Delay69 Street NW to 74 Street NW
through October 31112 Avenue over Wayne Gretzky Drive will be reduced to one lane (split to the north) in each direction with the left turns maintained for bridge rehabilitation. Off ramps from Wayne Gretzky Drive are reduced to a single lane. Starting Wed, Apr 29 at 1am.
Windermere Boulevard SW
DelayTerwillegar Drive NW to Windermere Way SW
through October 31Starts May 8th. Travel Delays Windermere Boulevard from Terwillegar Drive to Windermere way due to Road Construction.
Jasper Avenue NW
Delay114 Street NW to 124 Street NW
through October 31Jasper Av is reduced to one lane in each direction. 114 St to 124 St will be closed at various times to accommodate the work. Sidewalks will be closed in various phases for replacement.
153 Avenue NW
Delay97 Street NW to Beaumaris Road
through July 13, 2027Starting after 9AM on Monday, July 13, 153 Avenue Westbound will be reduced to one inside lane from the West side of 97 St to the East side of Beaumaris Road. North sidewalk closed at worksite and detoured to 154 Ave, 101 St, 155 Ave, 102 St, and Beaumaris Road. Detour route markers and wayfinding signs will be installed.
142 Street NW
Delay101 Avenue NW to 103 Avenue NW
through June 20, 2028142 St will be reduced in capacity between 101 Av and 103 Av in vairous phases for West LRT construction. Use other routes.
142 Street NW
DelayStony Plain Road to 103 Avenue NW
through October 31The sidewalk on the East side of 142 St will be closed from 103 Av South to 103 Av North. Detour to the West side or use the alley.
149 Street NW
Delay101 Avenue NW to 103 Avenue NW
through June 20, 2028149 St will be reduced in capacity between 100 Av and 102 Av in vairous phases for West LRT construction. Use other routes.
87 Avenue NW
Delay159 Street NW to 182 Street NW
through December 3187 Av will be reduced to 1 lane in each direction in various phases from 159 St to 189 St. For more information visit https://marigoldinfra.ca/current-construction-notices/
156 Street NW
Closure91 Avenue NW to 100 Avenue NW
through June 20, 2028Various Northbound and Southbound single block closures scheduled as required, to facilitate West LRT construction along 156 St; 91 Ave to 100 Ave. Work to take place during off-peak hours, please use other routes.
132 Avenue NW
ClosureDelwood Road to 82 Street NW
through November 30132 Ave closed from 82 St to Delwood Road. Sidewalks maintained on one side of 132 Ave at a time.
Meadowlark Road NW
Closure156 Street NW to 87 Avenue NW
through June 20, 2028Various Northbound and Southbound single block closures scheduled as required, to facilitate West LRT construction along Meadowlard Rd; 156 St to 87 Ave. Work to take place during off-peak hours, please use other routes.
87 Avenue NW
Delay159 Street NW to 153 Street NW
through March 31, 202787 Av Reduced to 1 Lane in Each Direction
76 Street NW
Closure101 Avenue NW to 99 Avenue NW
through October 31Road segment closed to vehicle traffic. Detour using alternate routes.
111 Street
Increased Travel Time9 Avenue to 29A Avenue
through October 29, 2027Various lane closure for LRT Construction
102 Avenue NW
Closure102 Street NW to 106 Street NW
through December 31Phase #2 (Replacing TDN #179): 102 Ave (Road and Intersections) will continue to be closed between 102 St and 103 St. On July 15, the 104 St / 102 Ave intersection will open and the 105 St intersection will close (See TDN#711). Additional changes to the 106 St / 102 Ave intersection are forthcoming but will be addressed in a new TDN once confirmed. The 103 St and 106 St bike facilities at 102 Ave will be detoured through the site, sometimes requiring a dismount and walk condition. Pedestrian access will generally be maintained on at least one side of each street.
23 Avenue
Increased Travel Time110 Street to Saddleback Road
through October 29, 2027LRT Construction; Various Lane Closures
Ellerslie Road SW
DelayRabbit Hill Road SW to Heritage Valley Trail SW
through December 31Starts June 16th. Ellerslie Rd from East of Rabbit Hill Rd to Heritage Valley Trail will be undergoing road construction. Full time speed reduction in place. Expect travel delays.
Graydon Hill Boulevard SW
Delay9 Avenue SW to Graydon Hill Point SW
through October 31Graydon Hill Blvd is reduced to a single lane per direction between Ellerslie Road and Graydon Hill Way SW. Temporary pedestrian detours in place. Expect travel delays
102 Avenue NW
Closure103 Street NW to 108 Street NW
through November 30, 2027Semi-permanent closure of 102 Ave bike facility, 103 St – 108 St with interim bike detour via 103 St between 102 Ave – 103 Ave, 103 Ave between 103 St – the shared pathway west of 109 St, and the shared pathway west of 109 St between 103 Ave – 102 Ave. 102 Ave closed, 102 St – 103 St. Westbound 102 Ave closed, 103 St – 108 St.
76 Avenue NW
Closure89 Street NW to 95 Street NW
through October 31Road/bridge closed to eastbound and westbound vehicle traffic.
108 Street
Increased Travel TimeJasper Avenue to 102 Avenue
through January 5, 2027Hoarding placed along west side of 108 Street from 102 Avenue to 50m south of 102 Avenue. Pedestrian traffic maintain along east side of 108 Street.
95 Avenue NW
Delay163 Street NW to 170 Street NW
through October 3195 Av will be reduced to 1 lane in each direction from 163 St to 170 St starting on April 27. The sidewalk on the south side will be closed. Use other routes.
137 Avenue NW
ClosureStarling Drive NW to 199 Street NW
through October 30|| Revised || 137 Ave closed, Starling Dr – 199 St. Local access maintained to Starling Dr via 137 Ave / Ray Gibbon Dr. Detour using Anthony Henday Dr, Yellowhead Tr, Winterburn Rd, 118A Ave/199 St to access locations west of the closure point. The timeline for completion is unknown.
121 Street NW
DelayFlight Line Road to Yellowhead Trail
through October 31121 Street from North of Flight Line Road to Yellowhead Trail will be reduced to a single lane in each direction. Yellowhead Trail Westbound to 121 Street Southbound dual left turn will be reduced to a single left turn lane for the duration of this work.
9 Avenue NW
Closure111 Street NW to 113 Street NW
through October 25Starts Aug 16th @ 9am. 9th Avenue From 111 Street to 113 Street will be closed due to road construction. Pedestrian detour in place to the south. Use 12 Avenue.
103A Avenue NW
Delay97 Street NW to 100 Street NW
through November 30103A Ave reduced to a single lane in each direction from 97 St – 100 St. North sidewalk closed from 99 St – 100 St.
66 Street NW
DelayFort Road to 125 Avenue NW
through April 30, 2027Starting July 3 at 10AM, 66 Street will be reduced to single lanes and split to the East for ~4.5 months, West sidewalk closed. Split to West after, with East sidewalk closed. Use other routes.
Winterburn Road NW
Closure45 Avenue NW to Maskêkosihk Trail NW
through February 28, 2027Starts March 31st @ 9am. Winterburn Road from 45 Avenue to 23 Avenue will be closed due to road construction. Detour using 199 Street.
170 Street SW
DelayAmbleside Link SW to Windermere Boulevard
through October 31Starts Aug 31st @ 8pm. Traffic pattern change on 170 St SW Northbound at Windermere Blvd. Dedicated left turning lane closure. Left turns maintained in left through lane. Expect travel delays.
82 Street NW
Delay131 Avenue NW to 132A Avenue NW
through October 3082 Street Northbound curb lane closure from South of 132 Ave to 132A Ave.
34 Street NW
Delay119 Avenue NW to 114 Avenue NW
through February 14, 202734 Street, South of 118 Ave reduced to single outside lanes in Northbound and Southbound direction.
103 Avenue Nw
Closure142 Street NW to 140 Street Nw
through November 3103 Av will be closed from 142 St to the alley East of 142 St starting on October 13. Use other routes
101 Avenue NW
Increased Travel Time74 Street NW to 76 Street NW
through October 31101 AV eastbound and westbound reduced to a single lane in each direction with alternating traffic splits.
Rowland Road NW
Increased Travel Time84 Street NW to 87 Street NW
through October 31Dawson Bridge will be reduced to a single lane daily between 09:00-15:30hrs with all directions of traffic travel maintained under flagperson control.
127 Avenue NW
Delay122 Street NW to 124 Street NW
through October 30127 Avenue reduced to single lanes and split to the South side of 127 Ave between 122 St and 124 St. Sidewalk detoured to the North along 128 Ave.
100 Avenue NW
Closure105 Street NW to 104 Street NW
through November 17Westbound Directional Closure on 100 Ave from 105 Street to 104 Street, Eastbound traffic Maintained. Bike lane Closure, dismount and walk conditions in place. Please use other routes.
Lois Argue Road
ClosureCedric Mah Road to The Alley North of Cedric Mah Road
through October 23Full closure on Lois Argue Road from Cedric Mah Road to The Alley North of Cedric Mah Road
41 Avenue SW
Closure91 Street to Ewing Trail
through October 3141 Ave SW from 91 Street to Ewing Trail will be closed due to road construction. Local access to be maintained. Use 25 Avenue SW
79 Street NW
Closure112 Avenue NW to 115 Ave NW
through December 179 Street NW Full closure from 112 Ave – 115 Ave.
170 Street SW
DelayAnderson Way SW to Ellerslie Road SW
through October 31170 St SW from Anderson Way to Ellerslie Rd will be reduced to a single lane in both directions due to road construction. Expect travel delays.
101 STREET NW
Delay107 AVENUE NW to 106 AVENUE NW
through November 6Power Install at 101 St & 106 Ave. Single Southbound curb lane closed from 107 Ave to 106 Ave and Eastbound Curb lane closed on 106 Ave from 102 St to 101 St. Pedestrian detours in place during working hours. Lane closures in place during off-peak hours.
72 Avenue NW
Closureat 112 Street NW
through November 6Road segment total closure at intersection to all directions of traffic travel.
109 Street NW
Delay29A Avenue NW to 28 Avenue NW
through October 26Starts Oct 16th. 109 St from 29A Ave to 28 Ave will be reduced to a single lane per direction due to road construction. Pedestrians to detour to the East side of 109st. Expect travel delays.
111 Street NW
Delay29A Avenue NW to 23 Avenue NW
through October 22Starts Oct 8th. 111 Street southbound from south of 29A Avenue to north of 23 Avenue will be reduced to a single lane due to Capital Line LRT utility construction. Expect major delays.
82 Avenue NW
Closure56 Street NW to 50 Street NW
through October 3082 Avenue will be closed at West of 50 street.
96 Street NW
Closure81 Avenue NW to 82 Avenue NW
through November 1Road segment closed to northbound traffic.
87 Street NW
Closure95 Avenue NW to 96 Avenue NW
through November 15Road segment closed to vehicle access.
116 Street NW
Closure87 Avenue NW to 89 Avenue NW
through October 31Road segment closed to all directions of traffic travel.
99 Street NW
Closure102A Avenue NW to 103A Avenue NW
through December 2Starting Oct 13 at 9am, 99 St will be closed from 102A Ave to south of the City Hall Parkade access including the on street bike facility. Local access maintained to the City Hall Parkade via 99 St / 103A Ave. Cyclist access maintained via shared pathway on the west sidewalk. Westbound 102A Ave closed east of 99 St due to lack of exit point. Northbound 99 St to eastbound 102A Ave and local access on 102A Ave east of 99 St maintained.
Bellamy Hill
Delay99 Avenue NW to Macdonald Drive
through October 30Northbound 101 St right lane closed. Closures of the east sidewalk when crews are on site with local pedestrian access maintained up to the closure points. Full pedestrian access maintained via an on street pedestrian detour when crews are not on site.
Heritage Valley Trail SW
DelayAnthony Henday Drive NW to Ellerslie Road SW
through November 30Starts Oct 22nd. Heritage Valley Trail will be reduced to a single lane per direction from Anthony Henday Drive to Ellerslie Rd. All turning movements maintained at the Ellerslie Road intersection. Expect travel delays.
Aspen Drive East NW
Closure121 Street NW to 40 Avenue NW
through October 24Starts Sept 25th. Aspen Drive East from 121 Street to 40 Avenue will be closed due to utility repair. Local Access maintained.
Saskatchewan Drive NW
Closure99 Street NW to 91 Avenue NW
through October 24Sask. DR westbound closed from 99 ST to 91 AV nightly between 20:00hrs to 06:00hrs. Eastbound traffic will be maintained.
Sherwood Park Freeway NW
Delay50 Street NW to 71 Street NW
through November 1Westbound Sherwood Park Fwy from 50 St to 71 St will be reduced to a single lane. Use other routes.
182 Street SW
Closureat 28 Avenue SW
through November 15Starts July 29th @ 9am. 182 St & 28 Ave SW intersection will be closed due to road construction. Use other routes.
63 Avenue NW
Increased Travel Time105 Street NW to 99 Street NW
through November 1363 AV eastbound reduced to a single lane daily between 09:00-15:30hrs.
17 Street NE
ClosureAurum Road to 137 Ave NE
through October 3117 St NE is closed from Aurum Road to 137 Ave NE. 137 Ave NE is closed at Aurum Road. Local access is maintained.
41 AVE SW
DelayJAMES MOWATT TRAIL SW to QUEEN ELIZABETH II HWY
through October 26Travel delays on 41 Ave SW from James Mowatt Trail SW to QE2.
25 AVENUE NW
Closure42 STREET NW to 43 STREET NW
through October 2425th Avenue will be completely closed between 42nd Street and 43rd Street from October 15 to October 24. Please use other routes.
102A Avenue NW
Increased Travel Time100 Street NW to 101 Street NW
through November 6North sidewalk closed, pedestrian detour to south sidewalk. 102A Ave reduced to single lane in each direction.
50 Street NW
Delay98 Avenue NW to 101 Avenue NW
through October 23Single lane closure northbound 50 St from 98 Ave to 101 Ave. The Northbound 50 St to eastbound 101 Ave turn bay will also be closed. Use other routes.
111 Street
ClosureJasper Avenue to 100 Avenue
through October 30Nightly, beginning at 9 p.m. to 6 a.m., 111 Street from 100m south of 100 Avenue to 100 Avenue is closed to vehicle traffic due to crane lift for EPCOR Distribution utility work. Local Traffic maintained.
109 Street
Increased Travel TimeHigh Level Bridge to Saskatchewan Drive
through December 30The east side shared use path along 109 Street from 100m south of the High Level Bridge to Saskatchewan Drive / Walterdale Hill Road is closed for maintenance activity. Pedestrians and active mode users can still cross the High Level Bridge using the west side shared use path. Pedestrian and active mode user mapping is provided to help guide commuters. A portion of the far left turn lane along 109 Street from 200m north of Saskatchewan Drive / Walterdale Hill Road to 100m north of Saskatchewan Drive / Walterdale Hill Road is closed for maintenance activity. Left turns to Walterdale Hill Road and through movement to Saskatchewan Drive are maintained.
107 Street NW
Closure129 Avenue NW to 131 Avenue NW
through January 31, 2027107 Street Southbound closed between the alley North of 130 Avenue to 129 Avenue. One Northbound curb lane remains open. West sidewalk closed from 129 Ave to 130 Ave.
87 Street NW
Closure95 Avenue NW to 97 Avenue NW
through October 23Road segment closed to vehicle traffic.
Meridian Street
ClosureMarquis Boulevard NE to Fort Road
through November 30Meridian Street will be closed from Marquis Boulevard to South of Fort Road. Detour using 167 Avenue, 18 Street, and Fort Road.
83 Avenue NW
Closure107 Street NW to 109 Street NW
through October 31Road segment closed to vehicle traffic.
184 Street NW
Closure66 Avenue NW to 62B Avenue NW
through November 2184 Street will be closed from 66 Av to approximately 100m South of 66 Av. Use other routes.
107 Street NW
Closure79 Avenue NW to 81 Avenue NW
through October 31Road segment closed to vehicle traffic.
82 Street NW
Delay133A Avenue NW to 130 Avenue NW
through October 2882 Street Southbound curb lane closure from North of 132 Ave to South of 132 Ave.
109 Street
Increased Travel Time99 Avenue to High Level Bridge
through November 30Beginning at 9 a.m. Monday September 21 the west approach to the High Level Bridge will be closed for EPCOR Drainage Utility Construction.
99 Street NW
Closure62 Avenue NW to 60 Avenue NW
through October 2599 Street from 62 Ave to 60 Ave will be closed Saturday and Sunday to complete a rail crossing repair. Follow posted detour route.
102A Avenue NW
Closure95 Street NW to 96 Street NW
through October 30102A Avenue between 95 Street and 96 Street will be closed for Utility Construction. North sidewalk closure also in place. Local Access is maintained.
83 Avenue NW
Closure112 Street NW to 111 Street NW
through October 25Road segment will be closed to vehicle traffic nightly between 22:00 – 06:00hrs.
184 Street SW
Closure28 Avenue SW to 41 Avenue SW
through November 15184 Street SW will be closed from 28 Avenue SW to 41 Avenue SW. Use other routes.
Saskatchewan Drive NW
ClosurePrincess Elizabeth Park Road NW to 104 Street NW
through October 25Sask. DR westbound closed to vehicle traffic.
99 Avenue
Closure105 Street to 104 Street
through October 31Total closure on 99 Avenue from 105 Street to The Alley East of 105 Street.
83 Avenue NW
Closure112 Street NW to 111 Street NW
through October 25Road segment will be closed to vehicle traffic between 22:00hrs Oct.24 to 06:00hrs Oct.25.
Jasper Avenue
Increased Travel Timeat 116 Street
through October 30Left turns are banned for eastbound and westbound traffic along Jasper Avenue at 116 Street due to lane sharing on north side of Jasper Avenue west of intersection.
106 Street
Closure98 Avenue to 97 Avenue
through November 7106 Street total closure from 98 Avenue to 97 Avenue
111 AVENUE NW
Delay97 STREET NW to 105 STREET NW
through October 31Due to EPCOR Drainage work, Westbound 111 Avenue reduced to single lane from 101 Street to 105 Street. Westbound Curb lane closed from 97 Street to 101 Street. Pedestrian detours in place for work area. Local access maintained.
92 Street NW
Closure106A Avenue NW to 107 Avenue NW
through October 2792 Street will be total closed. Pedestrians and LRT will be unaffected.
170 Street SW
DelayRabbit Hill Road SW to 41 Avenue SW
through February 28, 2027May 24th – June 14th & July 19th – Feb 2027. 170 St Traffic will temporary be detoured west onto a temporary road while the existing road undergoes reconstruction. Full time speed reduction in place. Expect travel delays.
36A AVENUE
Closure66 STREET NW to WOODVALE ROAD W NW
through October 3036A Avenue will be completely closed from 66 Street to Woodvale Rd W from October 23 to October 30. Please follow the detour.
Yellowhead Trail
DelayVictoria Trail to Anthony Henday Drive
through October 26From Friday, October 23 at 9PM until Monday, October 26 at 5AM, Yellowhead Trail will be split to the Westbound lanes (two Westbound lanes, one Eastbound lane) from West of Victoria Trail to West of Anthony Henday Drive. Speed will be reduced. Access to Yellowhead Trail Eastbound from Victoria Trail will be closed.
94 Street NW
Closure118 Avenue NW to 117 Avenue NW
through October 3094 Street from 118 Ave south to alley will be total closed
94 Street NW
Closure118 Avenue NW to 117 Avenue NW
through October 3094 St from 118 Ave south to alley will be total closed
37A AVENUE NW
Closure63 STREET NW to WOODVALE ROAD WEST NW
through October 2737A Avenue will be completely closed from Woodvale Rd W to 63rd Street from October 20 to October 27. Please use other routes.
Ada Boulevard NW
Closure62 Street NW to 64 Street NW
through October 31Ada Boulevard will be closed between 62 Street and 64 Street from16:00 till 21:30 hrs
35A AVENUE NW
ClosureWOODVALE ROAD WEST NW to 60 STREET NW
through October 2735A Avenue will be completely closed from 60 Street to Woodvale Rd W from October 19 to October 27. Please use other routes.
93A AVENUE NW
Closure58 STREET NW to 67A STREET NW
through October 3093A Avenue will be completely closed from 58 Street to 67A Street from October 16 to October 30. Please use other routes.
105 Street
Delay98 Avenue to 100 Avenue
through October 31A Single lane closure from 98 Avenue to 100 Avenue far East lane. Expanding to a Double lane closure happening off-peak hours during 23rd and 24th of October. Keep Left.
92A AVENUE NW
Closure62 STREET NW to 68 STREET NW
through October 2392A Avenue will be completely closed from 62 Street to 68 Street from October 15 to October 23. Please use other routes.
66 Street NW
Delay120 Avenue NW to 122 Avenue NW
through October 2466 St reduced to single lanes and split to the West side through 121 Ave. 121 Ave closed from 66 St to 65 St.
97 Street NW
Closure75 Avenue NW to 76 Avenue NW
through October 31Road segment closed to vehicle traffic. 76 AV reduced to a single lane at 97 ST with all directions of traffic travel maintained under flagsperson control.
199 Street NW
Closure137 Avenue NW to Blackbird Link NW
no end date postedCombined with TDN 683: 199 St closed from north of Blackbird Link to 137 Ave. Limited local access maintained north of Blackbird Link. The timeline for completion is unknown.
82 Avenue NW
Increased Travel Time111 Street NW to 110 Street NW
through November 782 AV eastbound reduced to a single lane.
109 Street
Increased Travel Time102 Avenue to 103 Avenue
through October 26Beginning at 9 a.m. on Friday October 23, 109 Street northbound is reduced to a single lane until 3:30 p.m. on Monday October 26. Expect Delays.
102 Street NW
Closure105 Avenue NW to 104 Avenue NW
through October 29Starting at 9am Oct 29: 102 St closed from 105 Ave to approx. 50m south of 105 Ave. Local access maintained to the Rogers Place Arena Parkade via 104 Ave / 102 St. West sidewalk closed with pedestrian access maintained on the east side.
127 Street
Closure111 Avenue to 114 Avenue
through October 31Closure on 127 Street from 111 Avenue to 114 Avenue. From 16:00-22:00. Bike lane to remain open.
82 Avenue NW
Increased Travel Time111 Street NW to 112 Street NW
through October 2482 AV will be reduced to a single lane in each direction with traffic split to the south side from 22:00hrs Oct.23 to 06:00hrs Oct.24.
80 Avenue NW
Closure110 Street NW to 109 Street NW
through October 3180 Avenue will be closed between 110 Street to 109 Street from 15:00 till 23:59. The bike lane will remain open.
108 Avenue NW
Closure98 Street NW to 99 Street NW
through December 31108 Ave is permanently closed with the neighbourhood rehab.
