Edmonton in motion
Breaking ground
Everything under construction in the city — the towers, the warehouses, the decks, and what’s coming down.
0h 37m since last update
The big ones
Under the cranes
$97M
To construct an industrial building for package delivery service – Amazon Delivery…
Storage Buildings, Warehouses
Drawing the block…
$31.8M
To construct a two-storey school (Public Education Service Use building). "Hays Ridge…
Elementary Schools
Drawing the block…
$31.4M
To construct a 2 storey Public Education Service Use building (Heritage Valley K-9).
Elementary Schools
Drawing the block…
$31.2M
To construct a 2 storey Public Education Service Use building (Crystallina Nera K-9).
Elementary Schools
Drawing the block…
$30M
To construct a new residential apartment building with 136 dwellings, underground…
Apartments
Drawing the block…
$29M
To construct a 5 storey parkade structure within PCL EDM Campus.
Parkade
Drawing the block…
$28.6M
To construct a six-story non-combustible residential apartment building (202 dwelling…
Apartments
Drawing the block…
$26.1M
To construct a 4 storey mixed-use building including 9 CRU (2HR demising walls included)…
Mixed Use
Drawing the block…
$25.5M
To construct a 6 storey apartment building (149 dwellings) on an existing 1 storey…
Apartments
Drawing the block…
$24.1M
To construct a 6 story combustible apartment building (131 dwelling units) on a common…
Apartments
Drawing the block…
$17.7M
To construct a six storey apartment building (87 dwellings) on an existing underground…
Apartments
Drawing the block…
$16.8M
To construct a combustible 6 story apartment building (98 dwelling units) with a two…
Apartments
The map
The build map
Drawing the city…
⬤ size = dollars · bubbles = small projects, tap to burst · 💥 coming down
Zoomed in, it’s a picture book
Drawing the neighbourhood…
🛏️ secondary suite · 💥 coming down · 🌞 sunroom/addition · 🏘️ rowhouses/apartments · 🔨 interior reno · ⬇️ basement · 🏡 exterior · ☀️ solar · 🪵 deck · 🛁 pool/hot tub · 🚗 garage · 🏠 new house · 🏢 commercial · 🧱 foundation · 🧰 odd jobs · 🚚 house move
The map key
What the icons mean
- pool/hot tub
- sunroom/addition
- interior reno
- new house
- rowhouses/apartments
- secondary suite
- basement
- garage
- deck
- solar
- exterior
- foundation
- commercial
- coming down
- house move
- odd jobs
Coming down 💥
Demolition row
11 in the last 90 daysOffice Buildings · DOWNTOWN since 1987 · 39 yrs
nothing filed for the spot yet
10150 – 102 STREET NW
Retail and Shops · OTTEWELL since 1994 · 32 yrs
zoned for shops and servicesnothing filed for the spot yet
5003 – 101 AVENUE NW
Row Houses · NORTH GLENORA
−6 homeslot assemblyzoned for apartmentsnothing filed for the spot yet
13345 – 109B AVENUE NW
Retail – Motor Vehicle · MORIN INDUSTRIAL
zoned for shops and servicesnothing filed for the spot yet
18202 – STONY PLAIN ROAD NW
Retail and Shops · STRATHCONA since 1932 · 94 yrs
lot assemblyzoned for shops and servicesnothing filed for the spot yet
8228 – 105 STREET NW
Office Buildings · PRINCE CHARLES
zoned for industrynothing filed for the spot yet
12230 – 124 AVENUE NW
Post-secondary Institutions · BLATCHFORD AREA since 1991 · 35 yrs
nothing filed for the spot yet
10820 – 118 AVENUE NW
Storage Buildings, Warehouses · CORONET INDUSTRIAL since 1997 · 29 yrs
site-specific zoningnothing filed for the spot yet
10003 – 56 AVENUE NW
Row Houses · NORTH GLENORA
−6 homeslot assemblyzoned for apartmentsnothing filed for the spot yet
10941 – 135 STREET NW
Mixed Use · GARNEAU since 1910 · 116 yrs
−5 homeslot assemblyzoned for apartmentsnothing filed for the spot yet
10701 – 85 AVENUE NW
Retail and Shops · BOYLE STREET since 1944 · 82 yrs
zoned for shops and servicesnothing filed for the spot yet
10316 – 96 STREET NW
The tally
Last 90 days: 11 goodbyes · 164 homes lost this year
